|
|
|
|
Product Details:
Payment & Shipping Terms:
|
BESS powered DC fast charger
Battery powered 360KW Charger with 1044KWh BESS
One CCS2 Connector and two GBT connector or GBT+GBT, CCS2+CCS2
![]()
A fast-charging solution designed for strategic locations where installing extensive infrastructure is difficult. It integrates a 240 kW DC charger and a battery storage and energy efficiency system (BESS) that acts as a power reserve. It can be charged from the grid when available and can also be equipped with optional solar backup.
01 Rapid deployment (minimal civil works)
Simplified assembly to enable loading where the site does not support major works or network reinforcements.
02 Reduced demand at the point (weak grid)
The BESS smooths peaks: the site can have a more "normal" grid connection and still deliver 240 kW to the vehicle.
03 Backup and continuity
If the grid is unstable or goes out, the system can continue operating for a period of time (depending on available power).
04 Photovoltaic backup (optional)
It can incorporate solar energy to reduce grid consumption and increase autonomy during the day.
05 Scalable and controllable
Modular and monitored architecture: easy to grow or replicate across multiple load points.